How progress is counted

Engineering gates (E)

Close only when met with committed evidence that a non-author can re-run or recount from a clean clone.

Research gates (R)

Close when met or negative-result. A negative finding is a valid, preserved answer to the question.

Owner decisions (O)

Close when a decision record is committed — for example setting a false-alarm budget or choosing whether to omit embedding.

Current gate counts

Taken directly from ROADMAP.md:

Gate groupTotalMetNegative-resultOpenMet gate IDs
Core M0–M54711036M0.1, M0.2, M0.3, M0.4, M2.5, M2.8, M2.10, M2.11, M3.0, M4.1, M4.2
Later profiles, EXT and RC413038IMGF.2, IMGF.3, IMGF.4
Core sequence

Milestones M0 through M5

Order: M0 → M1 → parallel M2 and M2E → M3 → M5. M4 can run independently after M1, and is required before any release claims cryptographic verification.

MilestoneGatesStatusWhat becomes possible
M0 — Explain and boundM0.1–M0.44 of 4 metUse cases, verification plans, discovery checkpoint, example matrix, and repository validation checks.
M1 — Freeze one code experimentM1.1–M1.60 of 6 metGo and Rust token extraction contract, hand-derived positive/negative vectors, catalogue and report schemas, requirement map, and strict pinned reproduction in both implementations.
M2 — Local comparisonM2.1–M2.114 of 11 met (M2.5, M2.8, M2.10, M2.11)Offline walkthrough, frozen fixture manifest, control classes including vendor boilerplate, separate fragment containment, atomic private storage, review packets (M2.7), and candidate-generation records (M2.9).
M2E — Embed and detectM2E.0–M2E.70 of 8 metOwner decision to select a new carrier candidate or omit embedding from the next release, plus reproducibility, quality, normalization, and transplant controls.
M3 — Measure usefulnessM3.0–M3.61 of 7 met (M3.0)Operational false-alarm budget (1 in 20 per repository search across 132 held-out negative searches), licensed 48-repository corpus manifest, disjoint splits, git-ancestor freeze check, and independent rerun.
M4 — Verify evidenceM4.1–M4.62 of 6 met (M4.1, M4.2)Library-based DSSE signing and verification, independent commitment code, negative cryptographic vectors, in-toto adapter, trust policy, optional timestamp adapter decision, and non-author review.
M5 — Candidate releaseM5.1–M5.50 of 5 metFull requirement map, README claim audit, offline clean-clone demo reproduction, explicit scope/limit release notes, and conformance matrix.
Later profiles and release criteria

Expansion tracks beyond the first case-study profiles

TrackScopeCurrent state
TS (TS.1–TS.4)TypeScript & JavaScript profilets-tokens frozen for stage 1; implementation and M3 split open.
IMGF (IMGF.1–IMGF.6)Still-image fingerprints (PDQ & ISCC)3 met (IMGF.2–IMGF.4 synthetic conformance run); item map, C++ comparison, and owner-gated natural-image check open.
IMG (IMG.0–IMG.5)Still-image embedded marks (TrustMark-Q & PixelSeal)Protocol e-img-m-2 frozen and reviewed; UC-7 wording and full measured run open.
TXT (TXT.0–TXT.8)Plain text & Markdown prosetext-plain frozen for stage 1; UC-8 acceptance, two-implementation check, and corpus stages open.
C2PA (C2PA.1–C2PA.3)C2PA soft-binding mappingIn progress with draft fixtures; no compatibility claimed until round-trip fixtures pass.
SK (SK.1–SK.2)Optional agent interoperability skillPlanned after I2; wraps stable CLI commands with transcript canary tests.
BIN, RES, STRUCT, KEYEDBinaries, resolver threat model, structural & keyed matchingGated after M3.4; not started.
EXT & RC (EXT.1, RC.1–RC.3)External review and 1.0 candidate criteriaOpen; requires named non-contributor review and two conforming implementations per stable profile.

Learn how decisions, reviews, and contributions work →